Not a lot to see today. The major accomplishment was the replacement of the door to the back porch. Out with the old wooden door, and in with an insulated steel one. The other pictures here show the oak flooring that was delivered today, and some patching of the sub-floor. The entire sub-floor was also re-nailed with ring shank nails to ensure no squeaking.